| 
                        Product Details:
                                                     
 
 | 
| Product Name: | CXB 2520 Plastic Trays LED COB Holder 39mm Diameter Simplify Installation | Diameter: | 39mm | 
|---|---|---|---|
| Height: | 4.15mm | Color: | White | 
| Certificate: | CRU | Material: | PET V0 | 
| Wire Spec: | 18AWG, 20AWG, 22AWG (0.32-0.81m㎡) | Match Led: | Cree CXA2520, CXB2530, CXA2540, CXA2590 | 
| Highlight: | led array holder,led cob holder | ||
1. Dimension: Dia39mm H4.15mm
2. Match Led: Cree CXA2520, CXA2530, CXA2540, CXA2590
COB Led Array base 24x24mm, Luminous surface diameter 21.2mm
3. Materials : PET V0
4. Wire Spec. 18AWG, 20AWG, 22AWG (0.32-0.81m㎡)
Specification:
| Product Model | C2520 | 
| Voltage Rating | 72 V | 
| Amperage Rating | 3.6 | 
| Weight | 3g | 
| Screw Size | M3 | 
| Wire Strip Length | 6mm (.24") | 
| Wire | 18-22AWG Push-In (.32-.81mm2) | 
| Body Material | PBT UL94 V-0 | 
| Contacts | Beryllium Copper Nickel Plated | 
| Holding Clip | Stainless Steel | 
| Screw Torque (Max) | 10 LBS | 
| Temp Rating | 155C | 
| RoHS Compliant | Yes | 
| Package Quantity | 1,000 per carton | 
| Packaging | Plastic Trays | 
| Array Source | Cree | 
| Array Series | CXA2520, CXB2530, CXA2540, CXA2590 | 
| UL File # | E476326 | 
It's a single piece, solderless connector for Cree CXA/B 25xx series
Simple screw down and poke in wires makes assembly of the COB device and easy and clean installation.
COB HOLDER Drawing:

Related COB HOLDER:
| Model No. | Lens Dimensions | Match Led | 
| C1512 | D35mm*H4.15mm | CXA1507, CXA1512, CXA1520 | 
| C1816 | D35mm*H4.15mm | CXA1816, CXB1820, CXA1850 | 
| C1830 | D35mm*H4.15mm | CXA1830 | 
| C2520 | D39mm*H4.15mm | CXA2520, CXB2530, CXA2540, CXA2590 | 
| C3050 | D44mm*H4.15mm | CXA3050, CXA3070 | 
| C3590 
 | D59.5mm*H3mm+3mm | CXA/CXB3590 | 
| CT1926 | D35mm*H4.15mm | Citizen Series: AC COB CLL296/297/298 | 
| E1313 | D36mm*H4mm | Citizen Series: CLL022, CLU024, CLU026 Edison Series: HM05, HM09, HM13 | 
| E1919 | D36mm*H4mm | Citizen Series: CLL032, CLU034, CLU036 | 
Product Application:
Led Street Light
Led High bay Light
Led Gas Station Light
Led Tunnel Light
Led Spot Light
 
Packing and Shipping:
1. Express: DHL, FEDEX, UPS, TNT...
2. Air cargo: It takes about one week to arrive the destination.
3. Sea shipment: It takes about one month to arrive the destination, depending on your actual requirements.
4. Payment terms: PayPal, Western Union, TT
5. Samples Lead time : Within 3-5 working days.
6. Bulk order Lead time :Within 10-18 working days.
7. Shipping port: Shenzhen/Yantian/Shekou
8. Packaging: Exported package, also can be customized according to customer requirements.
Contact Person: Miss. Alina Xiang
Tel: 86-13825255182